The clean that stands between a build and a turnover date.

Rough, final and touch-up phases, sequenced against the general contractor calendar. We clean the building in the order the trades actually finish it, not in the order that looks tidy on a schedule.

Construction dust extracted with an industrial vacuum before the final clean
Fine construction dust pulled out with HEPA extraction before the final detail phase begins.
Overview

Scheduling is most of this job

Post-construction cleaning fails on timing, not on effort. A crew that finals a suite on Tuesday watches a trade reopen the ceiling on Wednesday, and the work gets paid for twice or fought over once.

We plan the phases against the construction schedule and we ask the question most cleaners skip: which areas are actually closed out. Rough clean where the trades are still working, final where they are finished, touch-up after punch list.

Construction dust is also not office dust. It is fine, abrasive and it settles for days after the visible mess is gone. That is why the final phase includes surfaces nobody thinks about: vent faces, door frame tops, light coves and the inside of cabinets.

Phases
Rough, final, touch-up after punch
Coordination
Against the GC schedule, area by area
Crew size
Scaled to the turnover date
Access
Nights and weekends when trades are off site
Debris
Haul-off and disposal coordinated on site
Handoff
Walked with the GC or owner rep

What is included

Quoted per phase, so a rough clean is never priced as if it were a final.

Rough clean

  • Construction debris collection and haul to the site container
  • Gross dust knockdown on all horizontal surfaces
  • Sweep and shop-vac of all floor areas
  • Sticker, label and packaging removal from fixtures
  • Removal of excess drywall compound and paint overspray
  • Broom finish so the next trade can work cleanly

Final and touch-up

  • Detail clean of every surface, fixture, frame and reveal
  • Construction film and adhesive removal from glass and metal
  • Interior and exterior window cleaning to second floor
  • Duct, vent and diffuser face dust extraction
  • Cabinet, drawer and closet interior detail
  • Appliance, plumbing and light fixture polish
  • Hard floor first-cycle clean and initial finish where specified
  • Post punch-list touch-up on corrected areas

How the work runs

1

Read the schedule

We start from the construction calendar and identify which areas will genuinely be closed out, and when.

2

Quote by phase

Rough, final and touch-up priced separately, with crew size matched to the turnover date.

3

Work with the trades

Crews on site when trades are off, coordinated with the superintendent so nothing gets cleaned twice.

4

Walk the handoff

Final walk with the GC or owner rep, and a touch-up return after punch list corrections.

Who hires this program

General contractors, developers and owners with a date they cannot move.

General contractors

Phased cleaning across a full build, invoiced per phase against the schedule of values.

Tenant improvement

Suite build-outs in occupied buildings, cleaned without disturbing the floors still working.

Medical build-outs

Clinical spaces requiring fine dust removal before equipment installation and inspection.

Retail rollouts

New store fits scheduled tight against an announced opening date.

Renovation

Occupied-building renovations where dust control between phases decides everything.

Property owners

Turnover cleaning before a certificate of occupancy walk or a first tenant handoff.

Our approach

The first air in the building is our problem too

A newly finished building is full of construction dust and off-gassing from fresh finishes. What gets used in the final clean decides what the first occupants walk into.

  • HEPA-filtered vacuums and extraction, so fine dust is captured rather than stirred
  • Low-VOC products on freshly finished surfaces
  • Debris separated for recycling where the site container allows
  • Water use controlled, which also protects new finishes and substrates
  • Documented product list handed over for the building file
Finished conference room detailed and handed over after the final clean

Send the schedule, not just the square footage

Turnover date and phase plan are what we price against. Tell us both and you get a per-phase quote with the crew size it will actually take.